Progress

WE ARE MAKING PROGRESS
St. Tammany Parish Government, under the leadership of Parish President Mike Cooper, works hard every day to improve this Parish's infrastructure. Making roads smoother, clearing drainage, and improving our streets while making them safer, is what we're good at doing! The Parish continues to make improving our roads and drainage a top priority, year in and year out. The map below is a graphical depiction of what's in the works for 2022 and beyond.

TYPES OF CONSTRUCTION

  • Mill and Overlay- a street maintenance technique where the top layer (2 inches) of a street is removed by the grinding of a large milling machine. After the top layer is removed, a new layer of asphalt is put in its place.
  • Patch and Overlay- a street maintenance technique that requires smaller specific areas of a road be patched with asphalt, where there is degradation, but not a base failure (base failure = pothole). The road then receives a new top layer of asphalt.
  • Beautification- a project that improves the visual aesthetics of a right-a-way, roundabout or intersection, through plantings signage, wayfinding, lighting, etc.
  • Drainage- work designed to alleviate areas of excess water during or after a rain event. This work could entail a variety of work such as cleaning out ditches of plant life, digging out sediment from ditches, larger culverts, placement of catch basins, etc

AREA I - Service Area: Unincorporated Areas of Covington, Folsom, Mandeville and Madisonville
Foreman: Shannon Loyd
1305 N. Florida St.
Covington, LA 70433
985-892-1071
 
AREA II - Service Area: Unincorporated Areas of North Slidell, Hickory, Alton, Pearl River, Bush and Abita Springs
Foreman: Chris Graves
67835 Highway 41
Pearl River, LA 70452
985-863-5392
 
AREA III - Service Area: Unincorporated Areas of Lacombe and Greater Slidell
Foreman: Kato Pichon
34783 Grantham College Road
Slidell, LA 70458
985-641-0280